Delay in housing delivery process in Malaysia
dc.contributor.author | Chai, Chang Sa'ar | |
dc.date.accessioned | 2024-08-21T14:56:11Z | |
dc.date.available | 2024-08-21T14:56:11Z | |
dc.date.issued | 2014 | |
dc.description | Thesis (PhD. (Civil Engineering)) | |
dc.description.abstract | The challenges associated with housing delivery process in Malaysia have resulted in late delivery of housing supply and increasing numbers of sick and abundant projects. Although delays have been extensively investigated in the construction industry, it is still a common phenomenon especially for Malaysian housing industry. Therefore, there is a strong need to review the delay and reclassify delay factors in order to evaluate the housing delivery performance in Malaysia. This research aims at developing housing performance index to address delay in delivery process. As the delay factors are identified and classified, the factors which are gathered in an empirical survey are analyzed. Principal Component Analysis (PCA) is conducted on the information obtained from a questionnaire survey held. A numbers of 23 delay factors are extracted from a total of 91 delay factors which are classified into 3 categories of new delay classification; structural, institutional and cultural in housing delivery stages. The most successful mitigation measures in housing delay avoidance are identified. Structural Equation Modeling (SEM) is performed to examine the causal relationship of new delay classification and housing delivery process. A housing delivery performance index is derived from such SEM model. Structural delay recorded the highest index coefficient (0.42) as compared to institutional delay (0.28) and cultural delay (0.30) respectively. This demonstrated that structural delay is a significant influence to the housing delivery performance. The performance index can be improved by trading off mitigation strategy and potential delay factors. The index is essential to benchmark the housing delivery performance and hence provides a preliminary guideline to the construction players in handling housing projects. The index is verified via a semi structured interview and three case studies which proves its functionality in practice | |
dc.description.sponsorship | Faculty of Civil Engineering | |
dc.identifier.uri | https://openscience.utm.my/handle/123456789/1294 | |
dc.language.iso | en | |
dc.publisher | Universiti Teknologi Malaysia | |
dc.subject | Construction industry—Malaysia—Management | |
dc.subject | Housing—Malaysia | |
dc.subject | Housing development—Research | |
dc.title | Delay in housing delivery process in Malaysia | |
dc.type | Thesis | |
dc.type | Dataset |
Files
Original bundle
1 - 5 of 12
Loading...
- Name:
- ChaiChangSa'arPFKA2014_2.1.pdf
- Size:
- 62.63 KB
- Format:
- Adobe Portable Document Format
- Description:
- Development Approval Process and Document Checklist
Loading...
- Name:
- ChaiChangSa'arPFKA2014_3.1.pdf
- Size:
- 29.28 KB
- Format:
- Adobe Portable Document Format
- Description:
- Acts and Regulations Related to Malaysia Housing Delivery
Loading...
- Name:
- ChaiChangSa'arPFKA2014_5.1.pdf
- Size:
- 56.53 KB
- Format:
- Adobe Portable Document Format
- Description:
- DELAYS IN HOUSING DELIVERY STAGES PCA CUT OFF THRESHOLD (0.3-0.7)
Loading...
- Name:
- ChaiChangSa'arPFKA2014_5.2.pdf
- Size:
- 46.81 KB
- Format:
- Adobe Portable Document Format
- Description:
- CONSTRUCTION PLAYERS' RELATED DELAYS PCA CUTOFF THRESHOLD (0.4 to 0.7)
Loading...
- Name:
- ChaiChangSa'arPFKA2014_5.3.pdf
- Size:
- 29.43 KB
- Format:
- Adobe Portable Document Format
- Description:
- MITIGATION MEASSURES PCA CUTOFF THRESHOLD (0.4 to 0.7)
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed to upon submission
- Description: